Package Quote Path

HDB Renovation Package in Singapore

Built for owners who already want a grouped HDB quote covering kitchen, bathroom, carpentry and room-count budgeting instead of a broad renovation overview.

3-room / 4-room / 5-room HDB Kitchen + bathroom + carpentry Resale or occupied homes

What this page helps you compare first

  • Use this page to compare realistic hdb renovation package scope, budget range and next-step options first.
  • It works best before booking measurement, when you still need to separate must-do works from optional upgrades.
  • Send your floor plan, room count, kitchen and bathroom photos, plus whether wardrobes are included. We will help turn a broad package idea into a clearer quotation path.

Common hdb renovation package scenarios

These are the common planning situations we see before measurement is booked.

3-room refresh

Targeted layout, kitchen/bathroom and storage upgrade path.

4-room family package

Common mix of flooring, paint, kitchen and wardrobe.

5-room or larger resale

Useful when more rooms and carpentry are involved.

Scope we usually confirm before quoting

Lock these items earlier and the budget path becomes clearer.

Kitchen + bathroom

Core wet-area and kitchen scope.

Flooring + painting

Whole-home or selected-room finish updates.

Built-in carpentry

Wardrobes, shoe cabinets, TV walls and kitchen cabinetry.

HDB Renovation Package budget guide

Final pricing still depends on measurements, material level and hidden-condition risk.

Compact refresh S$12,000+ Selected carpentry and limited wet-area changes.
Core family package S$28,000+ Common HDB bundle with kitchen, bathroom and finishes.
Broader full-flat package S$45,000+ Larger HDB package with more rooms and carpentry.

Best info to send before quote

  • HDB floor plan and room count.
  • Photos of kitchen, bathrooms and main rooms.
  • Must-do now versus later-phase list.
  • Whether built-in carpentry is part of the package.

Typical workflow

  • Scope grouping: Group must-do works first so the package stays practical.
  • Measurement: Confirm room count, materials and sequencing.
  • Package quote: Issue a clearer path by zone and milestone.

What experienced owners usually check first

These quick checks often make the brief clearer before site measurement is booked.

Start with the right first packet

Photos, floor plan and a short must-do list usually speed up the first scope review.

Lock the main cost or timing driver early

For this topic, owners usually benefit from clarifying the biggest budget or scheduling variable before discussing finishes.

Separate must-do scope from optional upgrades

That one step alone usually produces a more realistic plan than discussing everything as one lump-sum idea.

HDB Renovation Package FAQ

Can you quote by room count instead of one lump sum?

Yes. We usually break the package down by zone or trade.

Do you support resale-flat rectification together with renovation?

Yes. Patch, leveling and leakage control can sit inside the same package path.

Can I phase the HDB package?

Yes. We can separate must-do works now from lower-priority phases later.

All FixMove services across Singapore

One team for plumbing, electrical, aircon, renovation, customization, handyman, installation and moving — island-wide.