Wet-Area Quote Path

Bathroom Renovation in Singapore

Open this when the real decision is toilet renovation, waterproofing renewal, tile reset or wet-area rectification instead of one-off leak patching.

Toilet renovation Waterproofing scope Leak-risk control

What this page helps you compare first

  • Use this page to compare realistic bathroom renovation scope, budget range and next-step options first.
  • It works best before booking measurement, when you still need to separate must-do works from optional upgrades.
  • Send your wet-area photos, leak history, property type and whether the bathroom is occupied. We will help separate rectification scope from full renovation scope.

Common bathroom renovation scenarios

These are the common planning situations we see before measurement is booked.

Old HDB toilet overhaul

Full wet-area redo with waterproofing and tiles.

Leak-risk rectification

Fix wet-area issues while refreshing the finish.

Condo resale bathroom update

Upgrade vanity and surfaces without a major layout change.

Scope we usually confirm before quoting

Lock these items earlier and the price range gets easier to set.

Waterproofing + curing

Membrane redo, flood test and curing time.

Tiles + drainage

Slope, trap position and overlay versus hacking.

Sanitary ware

WC, basin, vanity, heater and glass screen. If the bathroom is for an elderly user, plan grab bar installation before tiling so the anchor points land on solid backing.

Bathroom Renovation budget guide

Final pricing still depends on measurements, material level and hidden-condition risk.

Targeted rectification S$2,800+ Focused waterproofing or partial sanitary work.
Standard toilet renovation S$4,500+ Common single-bathroom wet-area package.
Premium full wet-area redo S$7,500+ Larger or more detailed wet-area scope.

A S$10 fuel surcharge applies to every visit. No additional standard call-out or inspection fee applies. Urgent service or a customer-requested appointment time adds one S$30 fee, subject to technician availability and confirmation. The S$30 is a separate service fee. Pricing terms.

Best info to send before quote

  • Wet-area photos.
  • Leak history or drainage issues.
  • Bathroom size or floor plan.
  • Preferred tile or vanity direction.

Typical workflow

  • Condition screening: Review leak and tile-risk signals first.
  • Site survey: Confirm size, hidden-condition clues and materials.
  • Quote + milestones: Issue a clearer wet-area budget direction.

What the bathroom quote should prove

A useful wet-area quote records the condition assumptions and handover checks, not only the visible finishes.

Hacking or overlay is condition-led

Record hollow or loose tiles, active leaks, drainage fall and substrate risk before choosing an overlay or full-hacking scope.

Waterproofing has named checkpoints

State the membrane extent and upturns, curing window, flood-test stage and who records the result before tiling resumes.

Penetrations and backing are frozen first

Confirm mixer, pipe, screen and grab-bar positions before tiles close the wall to reduce the risk of later drilling puncturing waterproofing or missing solid backing.

Bathroom Renovation FAQ

How long does a bathroom renovation usually take?

A typical toilet renovation often runs about 7 to 14 days depending on waterproofing and tile scope.

Do all bathroom renovations require full hacking?

Not always. Overlay or partial works may still be possible depending on site conditions.

Can sanitary ware and water heater replacement be included?

Yes. Common sanitary ware and heater scope can be included in the same plan.

All FixMove services across Singapore

One team for plumbing, electrical, aircon, renovation, customization, handyman, installation and moving — island-wide.

Related renovation & fit-out guides

Commercial RenovationRenovationInterior Design CostCar Workshop RenovationCondo RenovationConfinement Centre Renovation