F&B · Retail · Clinic Fit-Out

Commercial Renovation in Singapore

Plan restaurant, cafe, shop, retail, clinic and salon fit-out — from layout planning and M&E coordination to scope-dependent landlord and regulatory pathways. Where a submission, design endorsement or regulated trade is required, the relevant Qualified Person, licensed specialist or appropriately registered contractor must be appointed for that scope. Send the floor plan, lease conditions and target opening date for review.

Planning an office? Use the dedicated office renovation guide for workspace layout, office-specific cost drivers and reinstatement links.

Maintaining an operating business site? Use the commercial aircon servicing guide for one-off or scheduled FCU maintenance, asset records, access windows and scope exclusions. This is separate from a renovation or fit-out quote.

Scope-dependent approvals Qualified parties where required Schedule confirmed after review Design-and-build option

What FixMove handles for commercial renovation

  • F&B fit-out — restaurant, cafe, coffee shop, bar; kitchen exhaust, grease trap, gas, commercial plumbing and pipework, and seating layout.
  • Retail and shop — HDB shophouse, shopping mall lot, kiosk, showroom; shopfront, signage base, lighting and display joinery.
  • Office and workspace — use the office renovation page for partitions, meeting rooms, server-room, AV, low-voltage and office reinstatement scope.
  • Clinic, salon and wellness — consultation room, sterile zone, basin and wet area, soundproof partitions.
  • Scope and approval coordination — landlord, building-management and regulatory requirements are checked against the proposed work; submissions and endorsements are handled by the relevant Qualified Person or licensed/registered party where required.

Common commercial renovation scenarios

These are the planning situations we see weekly across new leases, takeovers and expansions.

New F&B opening

Hawker stall, cafe, restaurant or bar — kitchen layout, exhaust, gas certification, dining-area finishing and licensing inspection prep.

Retail takeover or refresh

Mall lot, shophouse or strata retail unit — shopfront, signage planning, lighting refresh and display carpentry.

Clinic takeover or reconfiguration

Review room layout, privacy, plumbing, equipment loads, accessibility and any approval triggers before a clinic fit-out scope is priced.

Clinic or salon build

Reception, consultation rooms, treatment zones with privacy partitions, plumbing for sinks and electrical for equipment.

Cloud kitchen or food workshop

Compact F&B kitchen with exhaust hood, grease trap and stainless-steel finishing, designed for delivery-first operations.

Pop-up or temporary fit-out

2-6 week temporary commercial renovation for events, seasonal stores or short-term lease activation.

Commercial renovation budget drivers

There is no reliable live package price without a measured scope. Use these cost drivers to prepare an itemised quote for the specific unit, intended use and lease conditions.

Existing conditionSurvey firstHacking, reinstatement, concealed defects, available power, drainage, exhaust routes and shopfront condition can change the scope materially.
Trade and useUse-specificRetail, clinic, salon and F&B units require different M&E loads, wet services, finishes, equipment interfaces and review pathways.
Approvals and specialistsScope-dependentLandlord submissions, design endorsements, Qualified Person services and licensed or registered trade work should be listed separately where triggered.
Programme and accessQuote in writingNight work, mall access, protection, delivery windows, testing, commissioning and opening deadlines affect labour and sequencing.

Scope-dependent approval pathways

The applicable pathway depends on the unit's approved use, landlord rules and proposed work. The relevant authority, landlord or building management grants approval; required submissions and endorsements must come from the appropriate Qualified Person or licensed/registered party.

URA use checks

A Change of Use application may be needed when the intended activity does not match the premises' approved use. Confirm the current approved use before design commitments.

Fire-safety review

Changes affecting escape routes, fire compartments, occupancy or fire-protection systems may trigger fire-safety submissions. A relevant Qualified Person or licensed specialist should assess and endorse the regulated scope where required.

Structural and regulated work

Structural alterations and regulated trades require the appropriate design, supervision, contractor registration or licence for that specific work. The appointment is confirmed after the scope is classified.

SFA licensing (F&B)

Food-service licensing requirements depend on the operator, food activity and premises. Layout, equipment and workflow should be checked against the applicable licensing conditions; use our 2026 SFA Food Shop Licence checklist to prepare the core documents and inspection records.

Kitchen exhaust and waste systems

Grease, exhaust, drainage and waste requirements depend on the cooking process, premises and building constraints. Obtain the relevant landlord and specialist review before construction.

Landlord and mall fit-out

Shopping mall and managed buildings have their own fit-out manuals, deposit and approval timelines.

What to send for a faster quote

  • Floor plan or rough sketch with measurements.
  • Lease type (HDB shophouse / strata / mall lot / office unit) and approved use.
  • Trade type (F&B, retail, clinic, salon, office) and concept reference.
  • Target opening date or hard deadlines.
  • Photos / video of current unit condition and shopfront.
  • Landlord or mall fit-out manual if available.

Typical commercial workflow

  • Site survey — verify dimensions, M&E provisions and lease constraints.
  • Concept and 3D — layout, finishes and equipment layout review.
  • Itemised quote — broken down by hacking, M&E, joinery, finishing and permit scope.
  • Submission and approval — identify the landlord and authority pathways triggered by the use and work scope, with a Qualified Person or licensed trade party appointed where legally required.
  • Build, test, commission — trades sequenced for opening day.
  • Handover and close-out — record testing, defects, rectification duties and any workmanship or manufacturer terms in the contract.

Browse commercial renovation by trade

Open the most relevant sub-page for your trade. Each links back here for cross-reference.

A S$10 fuel surcharge applies to every visit. No additional standard call-out or inspection fee applies. Urgent service or a customer-requested appointment time adds one S$30 fee, subject to technician availability and confirmation. The S$30 is a separate service fee. Pricing terms.

Commercial renovation FAQ

What does commercial renovation cost in Singapore?

A reliable quote requires the floor plan, proposed use, retained and new works, M&E loads, wet services, finish level, access rules and approval scope. FixMove can prepare an itemised written quote after reviewing those inputs; the written scope, exclusions and provisional sums control.

Do I need permits for commercial renovation?

Not every project needs the same approvals. Requirements depend on the approved use, building, landlord rules and whether the scope changes fire safety, structure, services, exhaust, drainage or accessibility. Where the law requires it, the relevant Qualified Person, licensed contractor or registered specialist must prepare, endorse or carry out that part.

How long does commercial fit-out take?

The programme depends on design sign-off, landlord review, authority or licence pathways, long-lead equipment, site access, testing and rectification. The project schedule should be issued after the scope and triggered submissions are reviewed, with dependencies and opening-date risks stated.

Can FixMove handle landlord and management approvals?

FixMove can coordinate drawings, method statements and submission information within the agreed scope. Any document that legally requires a Qualified Person, licensed contractor, registered specialist or other named professional must be prepared or endorsed by that party, and approval remains with the landlord or authority.

Do you do design or only build?

Both. We can take in your concept, layout sketch or designer drawings and convert to a buildable scope, or do the full design-and-build with you, including 3D visualisation, material proposal and shop drawings.

What should the handover and after-sales terms cover?

The contract should state inspection and testing records, defect reporting and rectification duties, exclusions, manufacturer documents, payment milestones and any workmanship or product warranty offered for the specific project. Only written terms included in the signed scope apply.

Scope, Approvals & Qualified Parties

Commercial approval needs are scope-dependent. The approved use, landlord rules and changes to fire safety, structure, M&E, exhaust, drainage or accessibility determine which reviews apply. A Qualified Person, licensed contractor or registered specialist must be appointed where the particular submission or trade legally requires one.

Verify before appointment: ask for the named party, licence or registration category, covered scope, exclusions and the relevant public-directory record where one exists.

Important: landlords and authorities grant approvals; coordination does not guarantee approval or timing. The written proposal should identify who prepares, endorses and submits each required document. See the verification guide →