Office Renovation Cost in Singapore

About FixMove — FixMove Singapore handles office renovation from $40 psf (light fit-out), $120 psf (full build-out) and $180 psf (F&B kitchen install) with BCA-approved scope and after-hours work for occupied buildings. FixMove assigns a dedicated project manager covering design, M&E, partitions, ceiling, flooring and punch-list close-out.

Useful when you need a practical office fit-out path around partitions, meeting rooms, lighting, flooring and move-in readiness.

Workspace fit-out Partitions + points Move-in planning

What this page helps you compare first

  • Use this page to compare realistic office renovation scope, budget range and next-step options first.
  • It works best before booking measurement, when you still need to separate must-do works from optional upgrades.
  • Send your layout, headcount and move-in target. We will help turn the office brief into a clearer fit-out estimate.

Common office renovation scenarios

These are the common planning situations we see before measurement is booked.

Startup or SME office

Lean workspace planning with meeting room and staff-zone priorities.

Re-layout before move-in

Best when the office needs new circulation, partitions and point planning.

Commercial refresh

Useful when the layout works but finishes, lighting and front-facing areas need upgrading.

Scope we usually confirm before quoting

Lock these items earlier and the price range gets easier to set.

Layout + partitions

Open office, meeting rooms, manager rooms and circulation planning.

Ceiling, lighting and points

Coordinate lights, switches, sockets, trunking and low-voltage routes.

Finishes + branding-ready setup

Flooring, repainting, glass works and front-of-house presentation scope.

Office Renovation Cost Guide (Singapore)

Office renovation cost in Singapore can vary greatly with office size in sq ft, the work required, and how much M&E and electrical work is involved — a light refresh and a full design build sit at very different price points. Final pricing still depends on measurements, material level and hidden-condition risk.

Light office refresh S$6,500+ Selected partitions, repainting and lighting updates.
Core office fit-out S$18,000+ Common commercial path with layout, points and finish upgrades.
Broader workspace build-out S$35,000+ Larger or more partition-heavy office renovation scope.

Beyond raw numbers, a good renovation contractor or interior designer plans your office layout and space planning around how the team works — from light installation and power points to high quality finishes and an office design for office space that enhances productivity.

Best info to send before quote

  • Office floor plan or measured sketch.
  • Headcount and room requirements.
  • Move-in date or operating deadline.
  • Photos of the current unit condition.

Typical workflow

  • Requirement intake: Review headcount, function zones and move-in target first.
  • Site review: Confirm layout practicality, building constraints and overlapping trades on sites.
  • Quote + schedule: Split the office fit-out by layout, points, finishes and handover milestones.

What experienced owners usually check first

These quick checks often make the brief clearer before site measurement is booked.

Start with the right first packet

Photos, floor plan and a short must-do list usually speed up the first scope review.

Lock the main cost or timing driver early

For this topic, owners usually benefit from clarifying the biggest budget or scheduling variable before discussing finishes.

Separate must-do scope from optional upgrades

That one step alone usually produces a a plan you can stick to than discussing everything as one lump-sum idea.

Office Renovation FAQ

Can you plan office renovation around a fixed move-in date?

Yes. We can group trades by deadline and prioritise must-open areas first.

Do you support meeting-room partitions and point planning?

Yes. Partition, lighting and socket planning are common office-renovation decisions.

Can you quote from layout and photos first?

Yes. A working estimate can be prepared before final site confirmation.

All FixMove services across Singapore

One team for plumbing, electrical, aircon, renovation, customization, handyman, installation and moving — island-wide.

Approvals and the office fit-out permit path in Singapore

Most office renovations in Singapore need a building plan submission through a registered QP (Qualified Person) and approval from the building's MCST or landlord before a single partition goes up. The two approvals that catch tenants out are SCDF Fire Safety and URA use. If your works touch the layout of exit routes, sprinkler heads, smoke detectors, the fire alarm zone or compartmentation, an SCDF Fire Safety Certificate (FSC) via a Qualified Person submission is usually required, and the building's existing FSC must not be compromised. If you are changing how the unit is used — for example part of an office becoming a training centre, clinic or F&B pantry beyond staff use — URA change-of-use or a written confirmation may be needed first. BCA matters where structural or A&A works are involved, and CONQUAS-level finishing is sometimes specified by Grade A landlords.

M&E drivers, real cost levers and timeline

On the technical side, the items that move both schedule and budget are rarely the carpentry. The big three are electrical capacity (does the existing DB and tenant power allowance support the new server room, pantry appliances and dense workstation load, or do you need a sub-DB and licensed EMA electrical worker), ACMV (re-zoning the air-con, adding FCU/VAV points and balancing airflow for new enclosed meeting rooms), and the ceiling void — fire, lighting, data cabling and air-con all compete for the same space above the false ceiling.

Costs go up with: after-hours and weekend work in occupied or CBD towers (loading bay slots, hoist booking, noise windows), Grade A acoustic glass partitions, raised access flooring, server-room provisions, and reinstating sprinkler/detector layouts. Costs come down when you keep the existing ceiling grid, partition lines and toilet positions, and phase the works. A realistic timeline for a typical office fit-out is around 2 to 6 weeks on site once approvals are in hand, but allow an extra 2 to 4 weeks upfront for QP drawings, FSC and landlord sign-off — these run in parallel and are the usual cause of delayed handovers.

Send us your floor plan, the building name (so we can check fit-out rules and lift access) and a few photos of the current unit on WhatsApp, and we will do a quick scope review and tell you which approvals your project actually triggers before you commit.