| Supply and earthing | Known supply arrangement, phase configuration, earthing arrangement and available site records | These conditions affect the appropriate device arrangement and connection method. |
| Distribution board | Board condition, available ways, main protection, existing MCB/RCCB layout, conductors and labels | An overcrowded, damaged or incompatible board can require separate remedial or upgrade work. |
| Risk and connected systems | Sensitive loads, solar PV, EV charger, generator, external feeds and any building lightning-protection system | Connected systems can require a wider coordinated design rather than one isolated device. |
| Handover | Device make and model, indicator status, labels, agreed electrical checks, shutdown window and applicable warranty terms | The handover should identify what was installed without promising absolute protection. |