BTO Renovation Cost Singapore 2026

Quick answer: BTO renovation package cost

For planning, selected-scope BTO renovation packages on this guide run from about S$15K–S$25K for a light package, S$28K–S$40K for a standard package and S$42K–S$55K for a broader renovation. Flat size alone does not set the price: carpentry, kitchen and bathroom scope, electrical points, flooring, finishes and booked BTO options all affect the written quote.

About FixMove — FixMove Singapore plans BTO renovation scopes around the floor plan, selected finishes and applicable HDB requirements. The itemised written quote states what is included, excluded, owner-supplied and subject to approval, together with the relevant workmanship and payment terms.

The selected-scope packages in this 2026 guide span S$15K–S$55K. A light scope may retain booked BTO finishes and limit carpentry; a broader scope can add kitchen and wardrobe carpentry, electrical points, flooring, bathroom work and premium finishes. These are planning bands, not a promise based only on flat type. The itemised written quote confirms the agreed scope, exclusions and variation process before work starts.

contractor meeting the applicable registration requirementsWritten quote before work startsdefect-liability terms stated in writing
💬 WhatsApp Quote (Fastest) 📞 Call +65 9823 7108 AI Quote Help

Share the floor plan and preferred scope; response and appointment timing are confirmed after the details are reviewed.

BTO renovation price bands

These are selected-scope planning bands, not flat-type quotations. Floor area can affect quantities, but the retained finishes, carpentry length, wet-work scope, electrical points and material choices usually matter more. Since kitchen carpentry is often the largest single run, the kitchen cabinet cost guide (indicative from S$380/ft) helps size that line first. An itemised quote follows the floor-plan and scope review.

Light packS$15K–S$25KLimited finishes, lighting and selected additions while retaining suitable existing items.
Standard packS$28K–S$40KMay add kitchen carpentry, built-in wardrobes and selected feature work.
Broader renovationS$42K–S$55KMay add bathroom work, ceiling features, premium finishes and more custom storage.
Carpentry onlyFrom S$12KIndicative kitchen, wardrobe, shoe-storage or study scope in standard finishes.
Kitchen scopeS$8K–S$18KIndicative cabinets, countertop and splashback; appliances and services may be separate.
Bathroom scopeS$5K–S$9KIndicative selected tiling, sanitary fittings, mixer, heater or waterproofing work.
Living feature wallS$1.5K–S$4KIndicative moulding, panel or selected decorative finish.
Aircon system and installS$3K–S$4.5KIndicative only; model, capacity, piping and electrical scope affect the quote.

Indicative ranges only. Send the BTO floor plan and preferred scope for review; quote timing is confirmed after the project details and any site-check needs are assessed.

What a BTO renovation package actually covers

A BTO flat may include selected finishes or fittings depending on the options booked, so the first useful step is to compare the handover condition with the proposed scope. Record defects and follow the developer or HDB rectification process before covering affected areas with carpentry or finishes. A typical project may then include space planning, carpentry, kitchen work, lighting and power points, painting, flooring or bathroom work. The written scope identifies work that needs HDB approval, an appropriately licensed trade or another prerequisite before it starts.

Which path fits your situation

Carpentry quantityMeasure the runCabinet length, height, internal fittings and finishes affect cost more reliably than room count.
Floor and wall finishesRetain or replaceCompare booked BTO options and handover condition before allowing for overlay, replacement or repair.
ProgrammeSequence and accessLead time depends on approvals, selections, fabrication, site access and the agreed order of work.

FAQ

Do BTO renovation works need HDB approval?

Requirements depend on the exact scope. The written quote identifies permit- or approval-controlled work and who is responsible before work starts.

Can I stay in the flat during renovation?

It depends on the work areas, dust, noise, utilities and the agreed sequence. The project plan confirms whether the flat can remain occupied.

Can I supply my own materials?

Yes, if the items and delivery dates are agreed before work. Supplier or manufacturer terms apply to owner-supplied products, while workmanship terms are stated in the written quote.

How are payments scheduled?

Payment milestones and any defect-liability terms are stated in the signed written quote or contract; one fixed schedule does not apply to every project.

✅ Licensing & Compliance — Renovation

Workmanship, payment and any defect-liability terms are stated in the written quote or contract. Where the agreed scope includes regulated work, the appropriate registered or licensed trade is assigned as required, and permit or approval responsibilities are identified before work starts. See our licence and verification information.