HDB Renovation Quote Singapore
Quick answer: HDB renovation quote Singapore
For a useful HDB renovation quote, send your floor plan, resale or BTO status, desired carpentry, kitchen and toilet scope, electrical points, flooring and move-in timeline. FixMove prepares an itemised quote so hacking, masonry, plumbing, electrical, carpentry and painting are separated instead of hidden inside one lump sum.
For a nearby contractor route before site measurement, use Renovation Contractor Near Me Singapore.
Send a complete floor plan, current-condition photos and scope brief for an itemised quote within 48 hours. Hacking, masonry, plumbing, electrical, carpentry and finishing are separated line by line.
What we cover
Hacking & masonry
Wall hacking, floor levelling, kitchen recasting, toilet rebuild.
Plumbing & electrical
Repipe, rewire, DB upgrade, water heater install — to code.
Carpentry
Built-in wardrobe, kitchen cabinet, TV console, study desk.
Painting & finishing
Skim coat, plaster ceiling, paint, tile, vinyl flooring.
How it works
WhatsApp the floor plan, room photos, desired works and target handover date. We clarify missing scope, prepare the itemised quotation within 48 hours after the intake is complete, then arrange a site measurement before the final contract.
© 2026 FixMove.sg · Singapore home repair and renovation coordination.
Frequently Asked Questions
How much does an HDB renovation cost in Singapore?
BTO 4-room typical range $35k–60k for full reno. Resale 4-room ranges $50k–95k depending on hacking and finishing.
Who carries out permit-regulated HDB renovation work?
Where the scope requires an HDB-registered renovation contractor, the written quote identifies the contractor and DRC details for verification before work starts. Electrical and plumbing work is assigned to the relevant licensed person where required.
Do I get an itemized quote?
Yes, every quote breaks down hacking, masonry, plumbing, electrical, carpentry, painting, and finishing line by line.
How long does HDB renovation take?
Typical 4-room full reno takes 8–12 weeks depending on scope and material lead time.
Can I split payment in stages?
Yes, standard payment is staged: deposit, mid-project, completion. No full upfront payment.
FixMove HDB Renovation Quote — How the Process Works
FixMove Singapore is permit-aware for HDB renovation with HDB scope checked before work and workmanship terms stated in the written quote. FixMove publishes itemised quotation within 48 hours of receiving floor plan, photos and scope brief — scope changes handled by written variation, no per-hour padding, no "contingency" line items. HDB renovation scope planning with dedicated project manager per job.
What FixMove needs from you to produce an accurate quote
- Block / unit type (1-room, 2-room, 3-room, 4-room, 5-room, executive, maisonette)
- Current condition photos: living, kitchen, bathrooms, bedrooms, ceiling, floor, windows
- Floor plan from HDB MyFlat or original sale-and-purchase document
- Move-in deadline (if any) — FixMove plans backwards from your handover date
- Budget range (FixMove will tell you honestly what's possible at each tier)
- Style preferences (modern, Scandinavian, industrial, minimalist, classic, transitional)
FixMove quotation deliverables
- Itemised line list: hacking, electrical, plumbing, tiling, carpentry, painting, accessories
- Material specification: brand, model, finish, warranty
- Timeline with weekly milestones and HDB permit submission dates
- Payment schedule: 5% / 30% / 30% / 30% / 5% with deliverable gates
- workmanship terms stated in the written quote terms and post-handover defect-rectification window
FixMove HDB renovation pricing: 3-Room from $25K, 4-Room from $32K, 5-Room from $42K (all BTO). Resale HDB from $32K with hacking. FixMove provides project-management scope and fee stated in the written quote.